WIP Daily — Friday 2026-10-30
wip.christrees.com
Status
| Site |
Nodes |
Tunnel |
Backup |
| cf |
✅ 3/3 |
✅ |
✅ 20261030-0200 |
| sl |
✅ 1/1 |
〰️ |
↑ cf |
| wf |
✅ 1/1 |
— |
↑ cf |
Schedule
| Time |
Code |
What |
| 06:30 |
andi |
fix furnace rollout switch bad |
| 07:00 |
cat9-wip |
daily cron report |
| 08:00 |
cat9-wip |
Repo communication model: how Wip, Chris, and partners coordinate through repos |
| 10:00 |
cat9-hwpc |
Money Ops: bank pulls + accounting for LLC and HWPC-RP |
| 12:00 |
chris |
lunch |
| 13:00 |
cat9-hwpc |
Build federal->Iowa 1065 crosswalk + Iowa line math (generate filable IA 1065 from pipeline data) |
| 16:00 |
andi |
mow |
| 18:00 |
chris |
dinner |
Active Epics
- 🔧 Physical TreesAES (effort tripwire)
cat9-treesaes — 0/4 ░░░░░
- 🔧 Physical Cole Farm Work
cat9-cole — 0/5 ░░░░░
- 💻 Dev HWPC Operations
cat9-hwpc — 6/8 ███░░
- 🖥️ Ops Federation Site Ops
cat9-ops-{cf,sl,wf} — 7/9 ███░░ ⚠️
- 💻 Dev Federation Ops Tooling (backlog)
cat9-dev — —
Quick Links
Auto-generated by Wip morning-update. Last push: 2026-10-30 12:32